Business Type:
Manufacturer/Factory
Business Range:
Filling Machine, Filling Line, Beverage Machine, Beverage Filling Machine, Water Filling ..
Establishment:
2010
R&D Capacity:
OwnBrand, OEM
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Main Markets:
North America, South America, Europe, Southeast Asia, Middle East, Africa, Australia, Domestic
OEM/ODM Service
Sample Available

Steam Generator, 18kw Steam Generator, Small Steam Generator for Sale manufacturer / supplier in China, offering 18kw Steam Generator for Label Shrinking (ZQF-18), Pet Bottle Mineral Water Filling Bottling Production Plant (CGF16-12-6), Plastic Bottle Juice Hot Beverage Filling Machine (RCGF18-18-6) and so on.

1
    YRS
General Supplier

China Tubular Uht Sterilizer Manufacturer

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $50000.00/ Piece
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Process: Sterilizing
Power Source: Electric
Certification: CE
Tubular type UHT sterilizer:
Function:
The whole set of tube-style sterilization machine is especially used for one-off Sterilization of liquid
Substances such as milk, juice and drinks to make them last for a longer period through sterilization and cooling.
Homogenized after its temperature is raised to 65 ° C to 70 ° C. After homogenization, the milk is heated to 90 ° C for protein stabilizing, and the temperature will reach 120 ° C to 137 ° C for UHT sterilizing. Finally, the milk is cooled to 4 ° C~ 25 ° C and prepared for filling station.
In accordance with different requirement for heating, sterilization, heat preservation and cooling, the flow can be designed in combination, with various safety measures and high degree of automation for precise and stable control.
Technical Parameter:

Capacity(t/h)1T-10TInlet temp(° C)5Preheating temp(° C)85-90Light inlet temp120° C -137° CCooling water(° C)≤ 25° CInlet temp/ice temp≤ 2° CCompressed air(Mpa)0.5Steam inlet(Mpa)0.6Control modePLC


100% down payment after sales contract signed.

12 months from shipment date. During one year we can provide parts for
free due to bad quality, but human error is not included. From the second year, parts only
collect cost price.

Within 40 working days after receiving deposit.


We can send engineer to help installation and debugging for the machine in local of customer, also train the worker how to operate and maintain the equipment.

The round tickets, boarding in local are done by the customer and US$80/person/day should be afforded by the customer