UL FM 300psi Ductile Iron Grooved Pipe Couplings From China
1.Product DescriptionProducts SeriesRigid Coupling, Flexible CouplingGrooved Equal Tee, Grooved Reducing Tee, Threaded Reducing TeeGrooved Mechanical Tee, Threaded Mechanical Tee, Threaded U-Bolted Mechanical Tee 90°Elbow,45°Elbow,22.5°Elbow,11.25°ElbowGrooved Equal Cross, Grooved Reducing Cross, Threaded Reducing CrossGrooved Reducer, Threaded Reducer, Grooved Eccentric ReducerGrooved Adaptor Flange, Threaded Adaptor Flange,CapProduce per Customer's DrawingProducts RangeFM UL CE approved Ductile Iron grooved Pipe fitting and CouplingsBrandWFHSHCertificationFM/UL/CE/ISOSize1/2 inch-16 inchMaterialDuctile Iron, ASTM A536/QT450-10TechniquesCastingWorking Pressure300 PSI/2.07 MapSurface FinishEpoxy Powder,Paint,Galvanization, DacrometPackingPlastic bags,Cartons,Packing belt,plywood pallet,Plastic FilmCapacity80000 Tons/YearDelivery Time20 days after receiving the depositPayment TermDiamond Tools T/TApplication1)Automatic sprinkler system for fire protection on commercial ,civil and municipal constructions like water supplying ,gas supplying, heat supplying,etc2)Industrial pipeline system on shipping ,mine, oil field,textile,powder plant,etc.3)Pipeline system on subway station ,railway station ,airport, seaport,bridge,etc2. Strongest Strength
3.Product Show
4. UL FM 300psi Ductile Iron Grooved Pipe Couplings From ChinaMainAccessories
Bolts and Nuts
Lab Hear treated and electro galvanized bolt with oval neck and heavy duty hexagon nuts.
Track head meet to the physical and chemical requirements od ASTM A 449 and physical requirementof ASTM A-183.
Rubber GasketMaterialCompositionGasket Mark ColorApplocableTemperature
EPDM
E
Black
34ºC- +150 ºC
Tag Gun Siliconrubber
S
White
-40ºC-+177ºC
Nitrile rubber
N
Black
-29ºC-+82ºCNotes:1.Gasketringsofdifferentmaterialswillbeusedfordifferentliquidmediums.
2.Productscanbesuppliedaspercustomersrequirments.
5.Product Application
6.Customers'Gallery and Exhibition
7.FAQ ForUL FM 300psi DucValve tile Iron Grooved Pipe Couplings From ChinaQ1: Can Ihave my own customized product?
A: Yes, your customized requirements for color, size, package, mark, etc.
Q2: How loCable Tools ng is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is accoSurveillance, Control & Protection rding to quantity.
Q3: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4: What are your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shipment.