Business Type:
Trading Company
Business Range:
LPG Cylinder Production Line, Electric Water Heater Tank Production Line, Automatic ..
Establishment:
2017
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T, WesternUnion
Main Markets:
South America, Others
OEM/ODM Service
Sample Available

Welding Machine, Girth Welding Machine, Arc Welding Machine manufacturer / supplier in China, offering Circumferential Seam Welding Automatic Seam Welder, Punching Machine for Electric Water Heater Boiler Outer Tank, Outer Shell Punching Machine for Bathroom Electric Water Geyser Production Line and so on.

1
    YRS
General Supplier

China Washing Line for Steel Drum Production Line

Get Latest Price
Min. Order / Reference FOB Price
10 Piece Contact Supplier
Local Area: Taian, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, WesternUnion
Transmission Type: Flexible
Automatic Production Line: Comprehensive
Certification: ISO, CE

Washing Line For Steel Drum Production Line
(1) Rain spray channel: please read the form of wash equipment technology processes;
(2) Wash transportation
Length: 42.25m
Type:The drums transported go ahead and rotated itself
Speed: 0.5-4m/min.
Motor: Electric-mange. no step/class to adjust speed;
Material:Chain---304 stainless steel or others;
Wheel shaft---2Cr13 stainless steel;
Wheel---casting iron;
Rail---304 stainless steel;
(3) Drying channel:
Demission: L8M; W1.5M; H1.7M
Heating way: Burning oil to be heated (made in Italy)
Oil consumes: 30kg/h
Work temperature: Room temperature to 120 ºC
(4) Drying transportation:
Length::34m
Type:the same as wash line;
Speed:0.5-4m/min.
Motor: Electr.-magn. No step/class to adjust speed;
Material: Chain---carbon steel or others;
Wheel shaft--- carbon steel;
Wheel---casting iron;
Rail--- carbon steel;
Channel liquid heating system: steam heating (steam temperature more than 100 ºC)
(5) Turning machine
Use purpose: After drums clean, to put the drums on the painting transport chain that position is from horizontal to vertical;
(6) Control box:1 set (to control the channel liquid temperature, transport speed, liquid supply in the wash line)


Production Process



FAQ
Q: How do you ensure quality?
A: we have a strong design & technical team, Our team ensures the production process at every stage and our QC will inspect each procedure as well. we can design and manufacture as your requirements.

Q: How to get an accurate quotation ?
A: Please provide us the detail of the workpiece such as drawings or daily out put
Q: What's the shipping cost from China to your country ?
A: We can send machine to your port by sea . Customers specify freight forwarders or negotiable shipping methods.
Q: Payment terms, MOQ, warranty, FOB...
A: Payment terms: 30% down payment against order
Delivery time: 3 months after receipt of formal order
Warranty: 12 months following delivery. We offer online service 24 hours all day long, Skype, Email etc. You can contact us any time.