Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Bag Making Machine, Film Blowing Machine, Printing Machine
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Film Extrusion Machine, Blowing Film Machine, Blown Film Machine manufacturer / supplier in China, offering Taiwan Qualtiy Nylon PE Plastic Film Extruder Machine, High Speed Poly Plastic Garbage Shopping Bag Making Machine Price for Sale, Four Lines Hot Selling High Speed Bottom Sealing Bag Making Machine and so on.

1
    YRS
General Supplier

China Wasted PP PE Recycling Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $13500.00/ Set
Local Area: Wenzhou, Zhejiang, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Material Processed: Film
Plastic Type: PE
Screw: Single-Screw
Wasted PP PE Recycling Machine

1. Machine Introduction
Plastic Recycling Machine is suitable for regeneration and granulation of waste plastics, such as HDPE, LDPE and PP &PET etc.
It's equipped with quick motor-operated filter-screen-replacing unit and automatic temperature control.
The granulating crusher uses adjustable speed synchronously.

2. Machine Advantages
1, Screw and barrel is nitrided by 72 hours. 38 chromium materials, it is very hard.
2, Motor with CE standard, more than 10 years life.
3, Hard surface gearbox, the life can be more than 5 years.
4, Electric parts is CHINT, the best supplier in China.
5, The screen changer is by electric controlling, you can choose hydraulic controlling.
6, Water tank is stainless.
3. Machine Parameters
ModelSJ-90BSJ-100BSJ-110BSJ-120BScrew DiameterΦ90Φ100Φ110Φ120Screw L/D LengthL/D 20:1-22:1Rational Speed of Screw Stem10-100r/min10-100r/min10-100r/min10-100r/minMain Motor Power22kw22kw30kw37kwOutput70kg/h95kg/h120kg/h135kg/hWeight of Overall(kg)2t2.1t2.2t2.5tCover Dimensions8000*1200*18008200*1600*18008500*1600*18008800*1600*1800
4. Machine Detail

1,Q: Your factory is trading company or factory?
A: We are factory. We have more 2100 square meter workshop and 23 workers containing the 2 installment engineer and 1 electric engineer.
We are Factory, so we have cost advantage than others
2, Q: How do your company control the machine quality?
A: First we control the raw materials quality.
Second, we control the quality of machine when we are processing.
Third, Our installment engineer will test machine.
3, Q: How about payment term, payment safety and delivery time?
A: We accept 30% deposit, balance before shipment. And Irrevocable L/C at sight.
Delivery time is 20 to 30 days. It is according to order quantity.
4,Q: What is your company after sale service?
A: Our installment engineers are available. Normally it will take about 7 to 10 days for all.
Our guarantee is one year. If there is any spare parts is broken, we can send them freely to you.

You are welcome to contact with us, we will provide excellent quotation and high quality machine