Business Type:
Manufacturer/Factory
Business Range:
Chiller
Establishment:
2012
R&D Capacity:
OwnBrand
Terms of Payment:
LC, T/T, PayPal, WesternUnion
Main Markets:
North America, South America, Europe, Southeast Asia, Middle East, Africa, East Asia(Japan, South Korea)
OEM/ODM Service
Sample Available

Freezer, Cooler, Heat Exchanger manufacturer / supplier in China, offering 1156kw OEM Economic Cycle Anti-Corrosion Water Cooled Chiller for Plastic Machine Use, 60HP Split Unit Structure Air-Cooled Screw Chiller for Plastic/Laser Moulding Machine, 60HP Industrial Air Cooled Screw Chiller for Plastic Machine Use with Ce Standard and so on.

1
    YRS
General Supplier

China Water Chiller Industrial Chiller Chiller

Get Latest Price
Min. Order / Reference FOB Price
1 Pieces US $65268.00/ Pieces
Local Area: Shenzhen, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal, WesternUnion
Type: Water-Cooled
Cooling Method: Water-cooled
Unit Structure: Split
Screw type chiller
Application
Medium and large scale industrial cooling
Central air conditioning system
Cold room, thermostatic chamberDesign featuresWell Known Brand CompressorUnit adopts Germany BITZERor Taiwan HANBELLbrand semi-hermetic screw compressor. The latest 5 to 6 patented screw rotor profile with excellent efficiency.Adjustable infinite or closely stepped capacity control, features energy efficient, stableand quiet running.Most advanced patented highest precision manufacturing process.Built-in full intelligeAnti-Static nt monitoring and protection including thermal motor temperature monitoring, phase sequence monitoring, manual reset lock-out, oil temperature sensor.Wide range of refrigerant for option, including R134a, R407c and R22(R404a, R507c upon request).Microprogramming Control SystemIndustrial PLC centralized control combined with compressor capacity control system, precisely monitor.Integrated protection for low temperature, high/low pressure, anti-freezing, phase missing, anti-phase, overload, motor over temperature, oil differential, flow switch, start up latency.Optional operation language, menu leading, unit running state easy to adjust.Easy Installation, Reliable RunningClosely stepped start-up, minimize impact to electricity.Steady and safe running, low vibration, easy for installation.Compact structure, less space demand and light in weight, easy for transport and installation.Completely wired, inspected and tested pre-delivery, saving installation time and cost.

Specification:ModelKDS-360Dcooling capcitykW1145.0kcal/h984,700Iput powerkW222.0Chilled fluid flowm3/h188.0Cooling fluid flowm3/h230Power3PH-380V-50HZ(200V/220V/415V 50HZ/60HZ)CompressorTypeSemi-Hermetic screw typeNumberAccess Control System Set2Start-up modeY -△Capacity control type(%)0~100(8 segments of tolerance)Power(kW)111x2Refrigeration oilTypeSUNISO 4GSChargeL23x2RefrigerantTypeR-22(R407c/R134a)Control modeThermostatic expansion valveFilling amount(kg)90x2EvaporatorTypeShell and TubePipeBPT 6"x2Condenser Type High efficient finned copper tubeProtective deviceCompressor overheating,over current,high and low pressure,over temperature,flow switch,phase sequence,phase-missing,exhaust overheating,anti-freezing.DimensionLmm4300Wmm1300Hmm2100Weightkg5150FAQ:
Q1. Do you have any MOQ limit for air conditioner?
A: Low MOQ, 1pc for sample checking is available.Q2. How do you ship the goods and how long does it take to arrive?
A: We usually ship bu DHL, UPS, Fedex or TNT. It usually takes 10 days to arrive. Airline and sea shipping are also available.Q3. Do you offer guarantee for the products?
A: Yeas, we offer 12 months warranty to our products. Q4: Where the application?
A: Our products have been widely used in many industries, like machine tool, data processing, telecommunications, financial, metallurgy, medical, building material, cars and war industry and etc.Q5: Are your products can btallurgy-Machinery-p3748/">metallurgy Machinery e customized?
A: Yes. Also welcomed to customized non-standard products, can achieve to -180 degree Celsius.Q6: Whats your payment term?
A: International term-30% deposit for production, 70% balance before shipment.