Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Wrapping Machine, PLC Coiling Machine, Packing Machine manufacturer / supplier in China, offering PLC Cable and Wire Coiling and Wrapping Machine, High Speed Wire Insulation Production Line, PE Cable and Wire Making Machine and so on.

1
    YRS
General Supplier

China Wire Strander Machinery Copper Aluminium Twisting Machine Twister

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $37800.00/ Set
Local Area: Dongguan, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Driven Type: Electric
Condition: New
Certification: ISO, CE
Wire Strander machinery Copper and Aluminium twisting machine twister
630/1+6+12+18+24
Rigid frame Strander
Copper wire
Φ1.5~Φ5.0mm
Aluminum and AL-alloy wire
Φ1.8~Φ5.0mm
Max. O.D. of cable stranded
Φ25mm
Stranding pitch6Bo
192r/min
12Bo
170r/min
18B
132r/min
24B
104r/min
500/ 1+6+12
Tubular Stranding
Diameter of single wire
Copper: Φ1.3~6mm
AL: Φ1.7~6mm
Steel: Φ1.0~6mm
Maximum stranding outer diameter
Φ45mm
Maximum speed of the strand
73.5-175 r/min
Diameter of hauling wheel
Φ1600 mm
stranding pitch
48-820mm
pay off bobbin in the frame
500mm
take up bobbin
1250-2000mm
Layout:

After-sale
1.Overseas on-site installation guidance and technical support including previous testing, operation instruction and talent training
2. Free lifetime online consultation service
3. Long-time maintenance, reconstruction and upgrade services of the wire and cable equipment
4. Additional service support, such as raw material or accessories supply and suggestions, etc.

Why us:
1. Our experienced technical team provide customized project plan for you according to your specific needs.
2. We guarantee to offer new superior goods.
3. We would like to send technicians to the installation site to help provide technical instruction, quantity estimation,installation, preliminary testing,and help start up operation. If there is any problems with the product, we will reply within 12 hours and arrive at the site within 36 hours.
4. After installation,We'll send skilled Technical personnel to conduct a preliminary test and answer any problems emerged. We will bear all the costs of maintenance, tests or retest within the scope of our duty stipulated in contract.
5. Within the validity of the contract,if the equipment can not be used properly due to our unqualified goods, improper files or the fault of our instructor, we'll change the products at once without compensation and take charge in all expenses of re-installation.