Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Boiler
Establishment:
2007
R&D Capacity:
ODM, OEM
Terms of Payment:
LC, T/T, PayPal, WesternUnion
Main Markets:
South America, Southeast Asia, Middle East, Africa
OEM/ODM Service
Sample Available

Steam Generator, Electric Steam Generator, Mini Steam Generator manufacturer / supplier in China, offering Mini 36kw 48kw 72kw Electric Steam Generator, China Industrial Fire Tube Natural Gas Diesel Oil LPG Fired Steam Boiler Price, Wns Model Dual Fuel Natural Gas LPG Diesel Bunker Oil Fired Steam Boiler and so on.

1
    YRS
General Supplier

China Wood Burning Boilers in China

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $100.00/ Piece
Local Area: Zhoukou, Henan, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal, WesternUnion
Function: Hot Water Boiler
Fuel: Coal-Fired
Installation: Packaged Boiler

Wood Burning Boilers in China

1. Product despriction

2. Applicable fuel:

3.Technical datasheet

Boiler model

DZH1-1.0-AII

DZH2-1.0/1.25-AII

DZH4-1.25/1.6-AII

DZH6-1.25/1.6-AII

Rated capacity

t/h

1

2

4

6

Rated pressure

MPa

1

1/1.25

1.25/1.6

1.25/1.6

Feed water temperature

ºC

20

20

20

20

Steam temperature

ºC

184

184/194

194/204

194/204

Active grate area

m2

1.35

2.7

4.57

8.59

Exhaust gas temperature

ºC

195

198

196

189

Design efficiency

%

76

76

78

80

Coal consumption

Kg

118

238

472

685

Weight of main part

t

8.6

10.9/11.3

18

23/24

Main part Dimension

mm

4320x1940x2685

5050x2440x3117

5650x2550x3434

6529x3100x3664

Delivery mode

Fast-packaged

Fast-packaged

Fast-packaged

Fast-packaged

4. Boiler Accessories

5. Typical projects
6.Packing and shipping
1. Way of delivery: by Sea or Railway or truck based on needs
2. Shipping model: by normal container and flat rack or bulk cargo based on differnent capacity. We have stable and experienced cooperate shipping company, and we will suggest suitable container.
3. Customers specifying freight forwarders or we send bottom shipping price from our forwarder partner for your reference, negotiable shipping methods.
4. Packing: nude for boiler main part in nude, accessories in export-use wooden box.
5. Payment Terms: T/T, LC; 30% deposits; 70% balance before delivery.
7. Our service

1.Payment Term, Delivery time & Validity Time.

(1)Delivery time 25-30 days counting from the date of collecting down payment.

(2)30% as down payment by TT, 70% by TT before delivery. Or by LC.

2.Inspection & Testing.

(1)Making following test before delivery.

(2)Hydrostatic test, ensure the standard working pressure and safety.

(3)100% X-ray NDT (non-destructive inspection) report of steel plate, tube and welding rod, to ensure the quality of the entire boiler.

3.Supervision of boiler Installation and Commissioning Service.

Supervision of installation and commissioning the equipment within delivery scope is available by our service team. But the Buyer will be only in charge of:

(1) The round air-tickets costs from Zhengzhou city to project site.

(2) Board and lodging of seller's workers for the entire period at the end-user's site.

(3) Necessary communication cost.

(4) Service fee of Seller's worker: USD 100/day/person, for the entire period at the end-user's site.

4.After sale service.

When the guarantee period is finished, the seller should provide product technical consults for free, and provide spare parts with favorable price.

5.Guarantee policy.

The guarantee period of the mechanical equipment and machines supplied by Henan yuanda shall be twelve(12) months commencing from commissioning date or 18 month from delivery time, whichever comes earlier.
8.Company introduction
9.Contact us
Click "send" to send inquiry to us or through the following ways to contact us.