Scaffolding Steel Pipe, Galvanized Steel Pipe, Scaffold Tube manufacturer / supplier in China, offering En39/En1065 Standard Hot Dipped Galvanized Steel Pipe Scaffolding, Hot Dipped Galvanized Round Steel Tube/Pipe for Building Material, LSAW Steel Pipe and so on.
Min. Order / Reference FOB Price | |
---|---|
10 Ton | US $550.00/ Ton |
Local Area: | Anshun, Guizhou, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T |
Type: | Welded |
---|---|
Technique: | ERW |
Material: | Carbon Steel |
Carbon Steel Scaffolding PipeOuter Diameter48.3mmWall Thickness1.5~4.0mmLength3-6M according to client requirementStandardEN39, BS1139, EN10255, EN10219, EN10210, EN39, BS1387,
ASTM A53, ASTM A500, ASTM A36, API 5L, ISO 65
JIS G3444,DIN 3444, ANSI C80.1, AS 1074,
GB/T 3091MaterialGr.A, Gr.B, Gr.C,
S235, S275, S355,
A36, SS400,
Q195, Q235, Q345CertificateISO 9001:2008,SGS, BV, CCIC etcFinish of pipePre galvannized with zinc 30-150g/m2;
Hot dipped galvanized with zinc 220~500g/m2;
Painted with black/varnish lacquer;
Oil on the surface to prevent rust;
Bare pipe without painting:
Epoxy painting/FBE coating/3PE coatingPipe EndPlain end/ Bevel end;
Grooved end;
Threaded on two ends, one end with coupling, one end with plastic capMarkingAs per client requirement or mill standardPackingOD>=273mm: Loose packing,piece by piece.
OD<273mm: In hexagonal seaworthy bundles packed by steel strips.
small sizes nested into big sizes.ApplicationsConstruction / building materials steel pipe
Scaffolding pipe
Fence post steel pipe
Fire protection steel pipe
Greenhouse steel pipe
Low pressure liquid, water, gas, oil, line pipe
Irrigation pipe
Handrail pipeTechinicalERW (high - frequency welded)Trade TermFOB, CFR, CIF, EXW, FCAPayment TermT/T, LCDelivery Time15-45 days (based on quantity) after receiving advanced payment by T/T or LC .Main MarketSoutheast Asia, South Asia, Middle East, Europe,
Middle&South America, Africa and Oceania
Overview of our mill:
Certificate:
Who We are?
(1) China Top 500 Enterprises Industry Leading Brands
(2) 15 years experience in manufacturing and exporting steel products since 2000.
(3) For 10 Consecutive Years of The First Production and Sales
(4) Key Project Supplier---Three Gorges Project, the Capital International Airport, Shanghai Pudong International Airport, the 2008 Olympic Games venues , the Word Expo 2010, etc.
What We own?
8000 employees.
59 ERW steel pipe production lines
36 Galvanized steel pipe production lines
24 square and rectangular steel pipe production lines
18 SSAW steel pipe production lines
5 LSAW steel pipe production lines
9 Galvanized square and rectangular steel pipe production lines
5 Seamless steel pipe production lines
3 national accredited laboratory
1 Tianjin government accredited business technology center
What Our yearly Production Ability?
Over 1200,0000 Tons sales and production
Production Line:
Strictly and Quality Control:
Safe Packing and Delivery:
Why choose Tianjin Youfa steel pipe group?
1. Strong strength