Business Type:
Manufacturer/Factory,Trading Company
Business Range:
tower crane, truck crane, wheel loader, road roller, excavator
Establishment:
2011
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
Mid East, Southeast Asia, Africa
OEM/ODM Service
Sample Available

Zoomding Machine Co., Ltd (WENZHOU) is a top construction engineering and plastic package equipment manufacturer and solution provider in Wenzhou city , China, especially for construction crane machin...

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Plastic Machinery Plastic Extruder China Zhuding Polyethylene Film Extruder Blowing Machine

China Zhuding Polyethylene Film Extruder Blowing Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $26800.00/ Set
Local Area: Wenzhou, Zhejiang, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Plastic Processed: PP
Product Type: PP Strap
Feeding Mode: One Feed

Product Description
Performance and Characteristic:
The machines uses LDPE or HDPE as materials , after being heatedextruded , blown , drawn and winded , the materials become plastic tubeAfter being sealed and cut , the tube can be made into food packagingbag , shopping bag and liner for PP woven sack . It also can be used asagriculture film , field film and shee film after one-or two-side cutting.

Type
Diameter of screw
L / D speed of screw( r / min )
Rotational speed of screw( kw )
Power of main motor( kw )
Heating power( kw )
Heating power (KW)
ZD-FM55 / 800
55
28:01:00
15-90
15
13
13
ZD-FM55 / 1000
65
28:01:00
15-80
18.5
18
18
Type
Production capacity( kg / h )
Max lay-flat width of film( mm )
Thickness of single film( mm )
Installing dimensions ( L*W*H ) ( mm )
Weight( kg )
ZD-FM55 / 800
15-40
800
0.006-0.05
4000*2600*3600
2600
ZD-FM55 / 1000
20-55
100
0.006-0.05
4300*2600*3900
3500
Main Products
Company Information


Shipping & Packaging
FAQ

1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor
etc.Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Contact Us