Shenzhen XGC Furniture Co., Ltd was established in 2009. We are specialized in research and development, manufacturing and sales for modernluxurious, fashioncreativity, low carbon and energy-saving, e...
Min. Order / Reference FOB Price | |
---|---|
2 Piece | US $129.00/ Piece |
Local Area: | Guangzhou, Guangdong, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, Paypal, Western Union |
Brand: | XGC |
---|---|
Specific Use: | Bar Table |
General Use: | Commercial Furniture |
Type: | Bar Furniture |
Welcome
Contact:
Phone: +8613530326690
Production Description:
modern mini bar table/bar table with wheels/plastic waterproof led aluminum bar table
Item No.: GF311
Material: PE (polyethylene) + Built –in LED lights
Size:56*56*110cm
Control: Remote Control via Remote
Power supply: 100-240V 50.60Hz (OUTPUT: 5 V 1A)
Battery: 4400mAh, 3.7V rechargeable lithium battery
Charge time: 6-8 hours ,Lasting Time: 12 ~ 14 Hours
LED Life: ≥ 50,000 hours
Working temperature: 0 - 50 °C
3. Certificates
Packing & Shipping:
Our product series:
1.Furniture:Main products: table, chair, stool,sofa, wine cabinet
2.Furnishing:Main products:fruit plate/food plate,ice bucket,wine cooler,pillow,table cover,chair cover,curtain
3.Decorations:Main products:flower pot/vase.ball, illar,decoration lights,decoration trees,Christmas decorations
Application:
Hotels& entertainment: bar, coffee ship, banquet hall, party, club
Outdoor leisure place: Garden, park, pool, beach, tourist attractions, public
Commercial center: Exhibition, mall, office, Wedding photography studio, conference room
Company information:
1.We are Professional LED PE furniture manufacturer since 2007 in China.
2.Modern style: With rich experience R&D team, and develop new styles to satisfy customers for each year.
3.High quality: With best SMD5050 led RGB lights, which is with soft light and long lifespan. and our battery is 4400MAH rechargeable lithium battery, it can be running about 10 ~12 hours.
4.Favorable price: With advanced equipment to improve working efficiency and reduce production cost.
5.prompt delivery:7to20 days(our normal mass production time is about 20 days,we can adjust the delivery
time as per customer's demands).
6.Certificates: CE,ROHS,UL.