Business Type:
Manufacturer/Factory,Trading Company
Establishment:
1998
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

1
    YRS
General Supplier

China outdoor sofa set with cushion

Get Latest Price
Min. Order / Reference FOB Price
100 Set US $150.00/ Set
Local Area: Guangzhou, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: Chandar
Specific Use: Garden Set
General Use: Outdoor Furniture
Mail packing: Y

Popular white flower vase rattan sofa set, outdoor sofa set with cushion

Two pcs single sofa + 1 pc coffee table can fit to be like a flower vase to save space Loadability of 40 HQ it is 108 setsDimension: DIA70 x H67, Package size:71x71x122one set wrap in carton paperAlu.wicker sofa set with 5cm thickness cushion and 5 mm tempered glass

Product Advantages:

frame constructure: sturdy, strong and light weight with good powder coated, no rusty problem.PE Rattan: water proof and UV proofCushion: high density foam, with removable cushion covers for easy cleaning, different colors optional.Two years warranty

Features:

Beautiful hand woven lookGreen product, UV-Resistant, weatherproof and colorfastExcellent handweaving technique with fashion designDisplay for patio, porch, pool side, garden or indoorHigh quality with competitive price

FAQ

1. Where is your factory located?

We have two factories; one is located in LongKou, Xinhua, Huadu district, Guangzhou. Another is in Laobian, Jinsha, Nanhai district, Foshan, Guangdong.It is 45 minutes drive from Baiyun Airport or 1 hour from city certer.

2. Do you provide samples?

Yes, we can provide most of the product samples. But we will charge a little model fee, if you placed the order we will pay back the sample fee to you and freight should be collected by your side.

3. How does your factory do regarding the quality control?

We believe that quality is priority so we always attach great importance to quality control from the very beginning to the end of the production. Every product will be fully assembled and carefully tested before packing and shipping.

4. How long for the delivery time ?

Normally it takes about 30-40 days according to type of product and quantity your order