Introduction
This machine is used for preshrinking and ironed tubular fabric, and equipped withmagnetic separating shuttle, hydraulic lifting platform, 18mm NOMEX carpet. The fabric could keep in a stable size during this process after drying machine. Less than 5% shrinkage and excellent softness could be reached.
based on different sources, we could offer the following four models:
Steam/Electricity+ConductingOil (Internal loop)/Electricity+Conducting Oil(External Circulation) / Conducting Oil Supply
The temperature of steam drying model could reach 130°C, other models'temperature are more than 180°C.
Our machine blanket is 18mm thickness, containingNOMEX material, which could resisthigh temperatureand not pollute the fabric.
*The width of fabric: 1500 mmMax.
**Standarddiameter of Cylinder is 450mm.Design DrawingBasic InfoModelFSYS450NameTubular Fabric SanforizerApplicationTextile-finishing(shrinkage rate:2-5%)Suitable FabricTubular knitted Fabric Pure cotton,wool,blended fabric(cotton content>65%)Techical DatesMain Matching Fabrictubular fabric of above 65% cotton contentheat sourcenatural gas /circulating conduct oil /steampre-shrinking type20mm Nomex compactingsupporting plate typemaglev separeted shuttlefabric outfeed typeauto precisely plaiterMax working width of supporting plate1450mmMax working width of felt1500mmworking speed5-30m/mindrum temperature control typeup &down separatly controldrum drive typeup &down separatly driveMax temperature of drumelectricity,conduct oil <190ºC,steam<140ºCbreadth adjustment typemanual and electromotioncapacity of machine10kwstandard machine power supply380V/3P/50HZcontrol power supply220V/24Vsteam specification of steam box3-6Kg/cm² saturated steamsteam comsuption of steam box50~100 kg/hcompressed air0.35-0.6MPadimensionL*W*H=6500mm*2740*2250mmtotal weight4.55T
Hankfeuer Gas Burner are applied in our control cabinet, which made our compactor machines more advanced and all of our textile finishing machines could be designed and produced according to your customized requirements.
Production LineOther ProductsPayment Terms:
Payment Conditions:30% down payment by T/T and the balance payment should be TT or in irrevocable L/C at sight.
Delivery time:30-60 days from the date of receiving down payment. All payment should be received before delivery in China.Any questions and requirments,contact us now!