Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Formwork, Climbing Formwork, Column Formwork, Single Sided Formwork
Establishment:
2015
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
LC, T/T, PayPal
Main Markets:
Domestic
OEM/ODM Service
Sample Available

Scaffold, Formwork, Building Material manufacturer / supplier in China, offering H20 Timber Beam Formwork with Excellent Construction Materials, Satisfactory Quality Construction Concrete Formwork, H20 Timber Beam Concrete Wall Formwork and so on.

1
    YRS
General Supplier
Supplier Homepage Construction & Decoration Construction Equipment & Tools Formwork Crane-Lifted Climbing Formwork CF220/250 for Concrete Construction

Crane-Lifted Climbing Formwork CF220/250 for Concrete Construction

Get Latest Price
Min. Order / Reference FOB Price
9 Square Met US $99.00/ Square Met
Local Area: Shanghai, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Certification: ISO
Material: Plywood/Timber Beam/Waling
Type: Climbing Formwork
Product Description
CF220/250 is aintelligent modular system, most of complex structural shapes and angle of inclination can be constructed, easily and flexibly.It isdesigned for high concrete wall structure construction, formwork and platform will be lifted integrity to the next step.Major Components
-ForPro Formwork System:
Timber Beam/Steel Waler/Waler Clamp/Lifting Bracket.
-Climbing frame:
Horizontal Bracket/ Diagonal Struct/ Vertical Waling/ Panel Travelling unit/ Waler Hook Bolt.
-Anchor Tie Rod System:
Climbing Cone/ Position Cone/ Positon Disc/ High Strengh Screw/ Snakelike Anchor.
-Safty System/Guardrail.
Feature
-Formwork panel can be retracted back 60cm from the concrete wall which provide enough space for formwork cleaning and anchoring point preparation. Formwork panels and climbing brackets are preassembled one time and can be reused many times.formwork and platform is integrity lifted to new position.-CF220 climbing formwork is safely anchored on concrete structure during the whole construction process, and provide orient safety work space for concrete pouring, formwork adjustment and structure surface repairmen. Safety access among different level's platform is prepared with customized Ladders.-CF220 climbing formwork could be adjusted forward, backward, left side and right side, structure shape can be maximally guaranteed. Pre-assemble formwork improve site installation precision.-One climbing unit will only consume 2anchors each casting step (one unit is composed of 2climbing brackets), and plywood could possible to be reused 30 times with properly operation. Damage ration will be greatly reduced as formwork system will not to be lifted between ground and construction section.Application Scope
CF220 climbing formwork system mainly applied in piers, TV tower, LNG tank, NPP containment, NPP plant and shearing wall of high-rise building etc.
important Note
- Climbing formwork need to be assembled strictly according to design drawings and permitted assembling tolerance is ±5mm.- Position cone need to be embedded perpendicular to concrete surface, max. permitted angle deviation is 2°.- Anchor parts embedded deviation in horizontal and vertical position should be less than ±10mm.-Anchor rod need to be bind with iron wire or steel bar to avoid displacement or dropping off during concrete pouring.-Sling need to be fixed to vertical waler when lifting climbing formwork unit, hoist ring of the panel is forbidden to be attached as lifting point.Our Services
- Project development
Analysis of the initial stage, and provide professional advice, consultation and formwork planning.
- Directional R&D
Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
- Bidding assistance
Choose abest propasal to help our clients to bid for the project.
- Design
Start to devise the formwork detailedly according to the winning bidding.
- On-site guidance
Provide the layout and assembly of the formwork, gives on-site advice and continuous support service.about ForPro
In 2016, we won orders from following project types: NPPLNG tankSubway stationHigh-risepylon. It is worth mentioning that we are involved in one of the most advanced nuclear power plants, Karachi nuclear power(K2/K3).In 2017, We have provided formwork products and technical services to Ningbo Metro Line 3, Hongyanhe NPP, Karachi NPP, Tianjin LNG, Putian LNG, Guanghui LNG, Hefei Metro Line 4, etc..We are now able to provide following self-produced systems: lager timber formwork; steel or aluminum formwork; climbing formwork system (crane lifting or hydraulic climbing); special system for DamCooling towerSingle wallTunnel system by full hydraulic; Standard parts (Timber or Aluminum beamTie-rodAnchor systemStrutPlywoodscaffold) (Partially by appointed professional suppliers)
Contact Us
Add: Room 308, Block A, No. 1779 Dongchuan Road, Minhang District, Shanghai, China
Tel: +86-21-33508070Web: www.forprosh.com