Business Type:
Manufacturer/Factory
Establishment:
2016
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

Dongguan HengYao Ultrasonic Machinery Co.,Ltd founded in 2016,is a professional manufacturing enterprise with a design of general machinery(face mask machine, non-woven making machine, ultrasonic aut...

1
    YRS
General Supplier
Supplier Homepage Textile Textile Machinery Custom 3 Ply Surgical Breathing Face Mask Machine

Custom 3 Ply Surgical Breathing Face Mask Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $51000.00/ Set
Local Area: Dongguan, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: HY

1. PLC control.

2. Photoelectric detection positioning.

3. Add printing device.

4. Tension control system.

5. Good appearance and rustproof with aluminum alloy structure.

It is a fully automatic production line to make foldable respiratory mask , which from nose wire welding, earloop welding to finished mask. It can be with extra function of ink-jet printer and pad printing system. It is available to reach the requirement of PM2.5 mask. It has a high automation and stability with a high output and mostly reduce the cost by completing products at one time.

Machine Size

7500*1050*1870mm

Output

38-45pcs/min

Voltage

220v

Power

3.6kw

1) Provide 24-hour service hotline.

2) Reply and find out solution within the shortest time according to customer’s requirement.

3) Provide on call service to help customer solve problems.

4) Provide free of machine installation as well as commissioning, and inform customer how to do the machine maintenance.

5) Prepare customer’s feedback tracking within one week after machine installation until meet customer’s satisfaction.

6) Provide one year guaranty and lifetime maintenance.

1. Q: How is the after sales service?

A:We provide 1 year guaranty and technical support lifetime. All machine’s parts can be replaced for free within 1 year if broken(excluding error operation).

2. Q: Is it difficult to install the machine?

A: The work shop should prepare full facility such as power and air compressor. For the first installation, engineer will be sent to set machine and do the machine training as long as manual instruction. For the further problems come out, we can provide video instruction as well.

3. Q: What’s the machine lead time?

A: For the standard machines, we can delivery within 30 days. If it is customized by customer(OEM), the lead time is 35-55 days.