Description:
An elastomeric bridge bearing is a commonly used modern bridge bearing. There are several different similar types of bridge bearings that include neoprene bearing pads, neoprene bridge bearings, laminated elastomeric bearings and seismic isolators, which are all generally referred to as bridge bearing pads in the construction industry.
Feature:
A. Small friction coefficient.
B. Larger shear capacity.
C. Suitable for large span bridge construction.
D. Excellent buffering and shock isolation.
E. Withstand vertical load and rotation.
Physical PropertiesPhysical PropertiesCRNREPDMHardness60±560±560±5Tensile Strength/Mpa ≥171815Elongation at Break/% ≥400450350brittleness temperature(ºC) ≤-40-50-60EN Compression Set(70ºC*24h)/% ≤153025Ozon Resistance(20% elongation, 40ºC*96h)100*10-325*10-8100*10-8Test Conditions(ºC*h)No CrackNo CrackNo CrackTensile Strength(%) ≤100*7070*168100*70Air Oven Aging(Max change, comparing withElongation at Break/% ≤151515datas without aging)Hardness Change402040Peel Strength between Rubber and Steel(kN/m) ≥0~+10-5~+100~+10Peel Strength between Rubber and PTFE(kN/m) ≥101010Mechnical PropertiesUltimate Compressive Strength Ru(MPa)≥70Measure of Compressive Elastic Mould E1(MPa)E±E*30%Measure of Shear Elastic Mould G1 (MPa)G±G*15%Measure of Shear Elastic Mould after Aging G2 (MPa)G1±G1*15%Concrete Bridge≥1/300Measure Corner Tangent tgθSteel Bridge≥1/500Measure Friction Coefficient μf (with grease)≤0.03
FAQ:Q: Can I have a sample?A: Yes, it is our pleasure to send free samples for checking quality and just undertake the?freight?charge by yourself.Q:What is the lead time for samples?A: Current sample need 1 day, customized samples need 5-7 days,Q:What express do you use to send the samples?A: We usually ship samples by DHL, TNT, FEDEX and UPS. It usually takes 3-5 days to arrive.Q:What is the payment terms?A: Our usual payment term is T/T and L/C . Others could be negotiated.Q:Can you produce as my drawing?A:Yes, we can customized for you?based on your drawing or sizes.Q:How about the delivery time?A:Usually production time is 10-15 days. It will be decided by the order quantity.about us: