Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Diesel Engine Pump, Centrifugal Pump, Diaphragm Pump
Establishment:
2012
R&D Capacity:
ODM, OEM
Terms of Payment:
LC, T/T
Main Markets:
North America, Europe, Southeast Asia, Middle East
OEM/ODM Service
Sample Available

Slurry Pump, Trash Pump, Diesel Water Pump manufacturer / supplier in China, offering 6 Inch Diesel Engine Self-Priming Centrifugal Sewage Water Treatment Pump, Stainless Steel Sanitary Food Positive Displacement Rotary Lobe Pumps, Food Grade Liquid Transfer Pump with 3A Standard and so on.

1
    YRS
General Supplier
Supplier Homepage Industrial Equipment & Components Pump & Vacuum Equipment Self-Priming Pump End Suction Self Priming Centrifugal Diesel Pump for Fire Fighting

End Suction Self Priming Centrifugal Diesel Pump for Fire Fighting

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $3.00/ Set
Local Area: Shanghai, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Type: Self-priming Pump With Inner Recirculation
Air Engine Type: Diesel Engine
Theory: Gas-hydraulic Hybrid Type
End Suction Self Priming Centrifugal Diesel Pump for Fire Fighting
JTseries self priming sewage pump is a kind of specialized sewage disposal equipment, designed with super strong anti-clogging and impurity disposal capability. It can be used to dispose ultra long fiber impurities and more than 3 inch solid, this trash pump is also widely used in fire fighting system.
ModelSpeed
RPMFlow RateHeadPowerInlet&outlet Dia.Max.Pass Solid Dia.Max.Suction Liftm3/hI/smKWHPmmmmmJT-3750*256.92.30.75180(3)63.51.5850308.331.521.8950*32.59.041.523.010504011.14.51.524.0115042.511.85.5344.912504512.5745.55.513505013.9845.55.81450*52.514.6105.57.56.415505515.311.55.57.56.416506016.712.57.5106.717506518.114.511156.718507019.416.511157.6195072.520.11815207.620507520.82115207.621508022.22318.5257.622509024.52618.5257.6235010027.527.518.5257.6
1.Outstanding Self Priming Performance
Ultra strong self priming performance enables this pump to be installed above the liquid level. Long drive shaft, hanging bracket and other devices are not required. What it only requires is to put suction pipe into the sewage. In first use, you only need to fill up the pump chamber with liquid to complete initial self priming. Then, the sewage pump can automatically conduct self priming, thus dramatically reducing installation time and maintenance cost.
2.Nearly Zero Clogging
Semi-open impeller design allows relatively large size solids and super long fiber to pass through the wastewater pump.The maximum diameter of solid particles is up to 3 inch . Even if it is clogged, the manual discharge port installed at the front of thepump can be easily opened to clear up the pump in few minutes.
3.Simple, Quick and Economical Maintenance
If you want to inspect or change impeller, machine seal, wear plate or other accessories, the only thinkyou need to do is to open the front cover and take out the r rotating assembly without having to diamantle the pipeline or pump.
1.Municipal engineering ,wastewater treatment ,constructional engineering2. Sewage collection or discharge in residential community
3. Sewage discharge in hospital and hotel
4. Centralized and staged disposal in sewage treatment plant
5. Water drainage station
6. Seriously polluted water discharge
7. Agricultural irrigation etc.1.Quality: we will test our pump before delivery, and wewill follow up the pump working conditions per three months when the pump put into use. If you need spare parts, we can send to you in 1 or 2 weeks.
2. On-sales Service: we will clear show you everything in fact when you place an order with us. We will take photos or videos to show you our production situation, and report the production situation to you.
3. Package: We use plywood case to pack our pump, which is durable for ocean transport.
4. Delivery: Delivery time will be on time as the contract. Usually, our company need 25 working daysfor diesel engine pump, and for bare shaft pump, it takes 15 working days,
5. Warranty: 12 month for the pump body, 3 month for the main working parts.