Introduction of gypsum powder production line with many kinds of capacity:1. Controlling Part: Full Automatic2. Capacity: Gypsum Powder Plant: 30, 000-300, 000 Tons Per Year
Gypsum Board Plant: 2 Million -30 Million M2/Year3. Fuel: Coal, Natural Gas, Heavy Oil, Diesel4. Raw Material:
1)Gypsum Powder Plant:
A)Natural Gypsum Rock. Content of CaSO4@2H2O >80%.
B)Desulfurization Gypsum
C)Dephosphorization Gypsum
2)Gypsum Board Plant:
A) Gypsum Powder;
B) Additives: Modified Starch, Glue, Foaming Agent, Protective Paper5. Quality Standard:
1)Gypsum Powder Quality Standard: GB/T 9776-2008
Gypsum Powder: 80-100mesh
The Initial Setting Time: Shall Not Be Less Than 6 Minutes,
The Final Setting Time: Shall Not Be More Than 30 Minutes
2) Gypsum Board Quality Standard: GB/T9775-2008
Product Specification:
Length: 2400mm~3600mm
Width: 1200mm or 1220mm
Thickness: 8mm-20mm6. Main Technology
1)Gypsum Powder Plant(Nature Gypsum Rock)
Gypsum Mine - Crushing - Grinding - Calcining - Aging -Finished Products (CaSO4.1/2H2O)
2)Gypsum Board Plant
Raw Material Blending-Shaping-Wet Board/Panel Conveying-Drying-Dry Board/Panel Conveying-Finished Product Stacking and Storage.
Controlling PartFull Automatic / Semi-AutomaticAnnual capacityCustomized (30, 000-300, 000 Tons Per Year)Calcining systemEbullition furnaceRotary kilnFuelNatural gas, diesel, coal, heavy oilRaw materialNatural Gypsum Rock (Content of CaSO4@2H2O >80%.)
Desulfurization Gypsum
Dephosphorization GypsumFinished powder usageGypsum boardPuttyPlaster powderQuality standard80-100mesh
The Initial Setting Time: Shall Not Be Less Than 6 Minutes,
The Final Setting Time: Shall Not Be More Than 30 Minutes
Welcome enquiry us!