Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Prefabricated Poultry House, Prefabricated Poultry Shed, Chicken Farm Building manufacturer / supplier in China, offering Full Set Automatic Poultry Equipment for Poultry Farm, Feeding a Type Cage Breeding System for Broiler, Automatic a Type Layer Chicken Cages Poultry Farm and so on.

1
    YRS
General Supplier

Full Set Prefab Pig Farming Shed with Pig Equipment

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $1.00/ Piece
Local Area: Qingdao, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Type: Pig Breeding Equipment
Usage: Pig Feeding Equipment
Application: Pig
Full Set Prefab Pig Farming Shed with Pig Equipment
Materials:1. The main frame is made of welded H-style steel.
2. The columns are connected with the foundation by pre-embedding anchor bolt.
3. The beams and columns, beams and beams are connected with high intensity bolts.
4. The envelop construction net is made of cold form C-style purlins.
5. The wall and roof are made of color steel board or color steel sandwich panels, which are connected with the purlin by Self-tapping nails.
6. Doors and windows can be designed at anywhere which can be made into normal type, sliding type or roll up type with material of PVC, metal, alloy aluminum, sandwich panel and so on.
Item nameMaterial characteristicsMaterial GradeSurface TreatmentAnchor boltSteel rod M24,M27,M30,M33,M39,M42Q235BSteel ColumnH shape, Box, steel pipe, Hot rolled sheetQ235B,Q345BPaint or Hot dip galvanizedSteel BracingSteel rod, Steel pipe, Angle steelQ235B,Q345BPaint or Hot dip galvanizedSteel BeamH shape, steel Truss, Hot rolled sheetQ235B,Q345BPaint or Hot dip galvanizedSteel PurlinC or Z shape, steel purlin Thickness:1.8mm~3.0mmQ235B,Q346BHot dip galvanizedExternal wall panel, Roof panelSingle colorful corrugate steel sheet, Sanwich panel with EPS, Rock wool, Pu, Glass wool etc.,Steel T=0.426~0.8mm, insulation T=50~150mmAlu-zinc 150g,
Fluorocarbon paintDoorSliding or rolling doorSteel or Aluminum sheet,T=1.0~1.5mmPaint or Hot dip galvanizedWindowAluminium alloy-Glass, Alminium alloy-shutterT=1.0~2.0mmAlloyDaylighting panelFRP, T=1.5mm or T=1.8mmCoefficient of thermal expansion:2.2x10-5/cm/
cm/ºCLight transmittance 85%VentilatorTurbine ventilator, ventilator along a slope, ventilator on a ridgeSteel,stainless steel, PCPaint or Hot dip galvanized,304GutterGalvanized Steel plate, stainless steel plateT=2.0mmHot dip galvanized,304DownpipePVC pipeΦ110,160,200PaintBoltOrdinary, high strength, galvanized10.9S,4.8sHot dip galvanized
Steel structure office building fabrication process:1. Prepare raw materials : cut steel plate or use internation size H section steel and angle steel, round tube, round steel, square tube etc.;2. Assembly and welding: our welders will follow the drawings to assemble the steel members and weld them together as a entire beam/column/brace and so on;(Our quality inspector will check the steel pieces after finish welding, this is the first quality check)3. Sand blast : After finish welding and polishing, our sand blast effect canreach internation 2.5 high grade, very good for resist rust;(Secondary quality check)4.Paint : Within 2 hours after sand blast, all the steel members should be paint. Client can choose any color and any brand of paint.(The third quality check)5. Inspect the goods by client : After we finish a part of fabrication work, we will invite clients to check the goods before we pack the steel frame.6.Packing and loading : If clients require us to load the goods by close containers, we will pack the steel structure members one by one on the steel skid and tie the whole steel package well.(The fourth quality check )
Advantage of the building:(1) Enough strong
it can resist 70m/s hurricane and G10 seismic intensity and protect your life and property. Furthermore, we also can design and build a stronger building according to your required.
(2) No water-seepage problem.
through the research and test by our technical team and construction team, we designed a whole reasonable and effective method of flashing plate and over-lapped of steel sheet, include(1. flashing plate on the roof, wall, bridge, eave, gutter and frame of window and door, 2. Joints between steel sheets and sky lighting belts, 3. Waterproof of nails ), with accuracy process and superior quality closure strips, we successfully reduce the leakage place from 1/1000 to 1/2500 place/sqm.
(3) High-performance heat insulation
Many sorts of material can be use as the roof panel and wall panel, which can bring the warm in winter and cold in summer for you house.
(4) Excellent Anti-corrosion and long life
shot blasting and 4 layers paint(90micron)/1 layer hot deep galvanized (80-200g/sqm) will provide our building 25-50 years life.
(5) Good air permeability and more natural lighting
natural roof turbine ventilators, bridge ventilators, Roof sky lighting belts, Wool sky lighting belts and varies of windows, they will bring us more fresh air and natural lighting.
(6) Quick installation
12 workers can assemble 1000sqm within 20 days.
(7) 100% recovery.We can also provide you below service:1. Poultry& livestock house site selection;
2. Poultry& livestock house design and construction;
3. Poultry& livestock equipment installation;
4. Poultry& livestock house worker training;
5. Breeding technology guidance;
6. After-sale technical consultation service;If you need any of the above products, please contact us, we will be sure to supply you the top quality products with excellent after-sale service, thanks.