Business Type:
Manufacturer/Factory
Business Range:
PCB Destacker, PCB Bare Board Loader, smt automatic unloader, semi solder paste printing machine, NG, OK PCB SMT Unloader
Establishment:
2014
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
Eastern Europe, Domestic Market, Central America
OEM/ODM Service
Sample Available

ChangDian( ShenZhen) Automatic Equipment Co. , Ltd....

1
    YRS
General Supplier
Supplier Homepage Textile Textile Machinery Full automatic Surgical face mask machine Flat Folded Mask Making Equipment

Full automatic Surgical face mask machine Flat Folded Mask Making Equipment

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $90000.00/ Set
Local Area: Shenzhen, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union

Automatic Medical Outer Ear Loop Face Mask Making Machine

Product Description

1. PLC control.

2. Photoelectric detection positioning.

3. Printing device optional.

4. Tension control system.

5. Beautiful strong and rustproof with the aluminum alloy structure

More Photo

FAQ

1. Q: How is the after sales service?

A:We provide 1 year guaranty and technical support lifetime. All machine’s parts can be replaced for free within 1 year if broken(excluding error operation).

2. Q: Is it difficult to install the machine?

A: The work shop should prepare full facility such as power and air compressor. For the first installation, engineer will be sent to set machine and do the machine training as long as manual instruction. For the further problems come out, we can provide video instruction as well.

3. Q: What’s the machine lead time?

A: For the standard machines, we can delivery within 30 days. If it is customized by customer(OEM), the lead time is 35-55 days.

Our Services

1) Provide 24-hour service hotline.

2) Reply and find out solution within the shortest time according to customer’s requirement.

3) Provide on call service to help customer solve problems.

4) Provide free of machine installation as well as commissioning, and inform customer how to do the machine maintenance.

5) Prepare customer’s feedback tracking within one week after machine installation until meet customer’s satisfaction.

6) Provide one year guaranty and lifetime maintenance.