Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Pocket Spring Machine, Mattress Packaging Machine, Pocket Spring Assembler, Automatic Glue ..
Establishment:
2017
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
T/T
Main Markets:
South America, Southeast Asia, Middle East, Domestic
OEM/ODM Service
Sample Available

Mattress Machine, Mattress Packing Machine, Mattress Rolling Machine manufacturer / supplier in China, offering High Quality Automatic Mattress Packing Machine Mattress Production Line, Spring Machine Automatic Pocket Spring Machine for Spring Mattress, Semi- Auto Mattress Vacuum Compress Roll Packing Machine Mattress Machine and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Textile Machinery & Parts Nonwoven Machine Fully Oceania Automatic Hot Melt Mattress Glue Line Mattress Machine

Fully Oceania Automatic Hot Melt Mattress Glue Line Mattress Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $120.00/ Piece
Local Area: Guangzhou, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: T/T
Condition: New
Certification: ISO, CE
Automatic Grade: Full-Automatic
Automatic Hotmelt Adhesive Glue Line(USA Nordson hotmelt application system)
***Machine brief introduction***The principle of work: the first layer foam is put into the feeding line of the feeding mouth by manual, and the foam is transferred automatically to the middle by centering conveyor, then it is conveyed to the spraying position after the above process. After self-detection of foam thickness, length, width, the sensor will adjust the nozzles' height, and make sure the spray glue pattern size will not exceed the foam's size. Glue trajectory could be set on the touch screen, it could be as straight line, wave line or combination pattern. Second layer foam or felt is also be used the same spray glue way. The sprayed materials are assembled on the assembly platform manually. First, the foam border and the bottom foam are fitted and glued together to make it as a box, then put the innerspring unit into it, covered by a glued foam, one spring bed core with foam border is assembled. The spring bed core is conveyed to the pressure holding platform for compression so as to ensure the hot melt adhesive is firmly adhered.***Technical parameters***
Model CharacterP703 Automatic Glue Spray Production LineProduction Capacity3 Pieces/minHot Melt Application SystemNordson (the USA)Capacity Of Glue Tank30LGluing MethodContinuous Gluing ModeControl Of Assembling PlatformElectronic ControlAir ConsumptionApprox. 0.5 m3/minAir Pressure0.6~0.7 MPaTotal PowerApprox. 25Kw
Power RequirementsVoltage3AC 380VFrequency50HzInput Current36ACable Section3*10mm2+2*6mm2Working Environment Temperature+5ºC~+35ºCWeightApprox.4500kgConsumption Material DataHot Melt GlueShapePallet Or PiecesViscosity125ºC--6100cps
150ºC--2300cps
175ºC--1100cpsSoftening Point85±5ºCFoam Size Range (mm)Length2000Width900~1800Height10~200
***Product picture and Graphic model***
***Configure and component list***
SNDescriptionConfigure and componentQty1Centering conveyorDetected by sensor, automatic self-aligning infeed by motor.12Glue Spray unit and position(gluing system and hot melt glue tank)Nordson (USA) Hot Melt Application system 30L, Hot Melt Lose Hose 6 pieces and Four hoses nozzle 6 pieces; Adopt Silicon Belts.13Assembly platformAdopt Silicon Belt, assembly sponge mattress that have been sprayed with glue14Holding compress platformCompress the assembled innerspring unit to ensure bonding strength between innerspring and sponge15ElectricalAdopt Schneider motion control system, 8pcs France Schneider Servo motor, 10inch touch screen, Schneider Low voltage electricity, 3pcs Danfoss frequency converterSeveral6SensorAdopt Japan Omron and Germany SICKSeveral7Gear box/Motor & RetarderAdopt Italy Varvel/Adopt China Hengxing Motor38Pneumatic componentsAdopt Taiwan AirTACSeveral9Liner railAdopt Taiwan HIWINSeveral10CableAdopt China ZhujiangSeveral
People who viewed this also viewed
about usGuangzhou Portal-Tech Co., Ltd is committed to developing automatic spring bed core manufacturing equipment, mattress assembly production equipment, mattress packing equipment, mattress factory assembly line and mattress plant equipment management system (MES) and kinds of automation devices and management systemsHave 11 patents; 8 utility model patents and 3 invention patents
Termsand ConditionsPayment:
30%byT/Tasdownpaymentbeforeproduction,andtherest70%byT/Tasbalancepaymentbeforeshipment.
TimeofDelivery:
Within50daysafterreceivingthebuyer'sdownpayment.
After-saleservice:
Installation&Commissioning:thesellercanprovidetheinstallation,commissioningandtraining
serviceinbuyer'sfactory,whilethebuyerneedstopayforVISAapplication,airticket,board and lodging expense,and(ifnecessary)interpretingfeeforseller'stechnician. And ensure that the problem will be started to be handled within 5 days after receiving the written notification from the buyer.
Warranty:
thesellerprovidesoneyearwarrantyofthemainmachinestartingfromthemomentthebuyersignsthe
acceptancecertificate.Forthewearingparts,consumptionofmaterialsandthedamageincurredbytheBuyer'sincorrectoperationareoutofthewarrantyrange.
Packing:
Wooden pallet, Wrap film. The seller is responsible for packing suitable for the characteristics of the equipment and the mode of transport.Our customer:
FAQ
1.Q:Are you afactory or trading company?
A: We are afactory.
2.Q:Where is your factory located? How can Ivisit there?
A: Our factory is located in Nansha Dist. Guangzhou, China. You can fly to Guangzhou Baiyun airport directly.
All our clients, from home or abroad, are warmly welcome to visit us!
3.Q:How does your factory do regarding After-sales Service?
A:"After-sales Service is priority. we always attach great importance to it. One year warranty after the acceptance. Training period last at least 3-4 days till all the operations are perfectly performed under regulations. Lifelong compensable service for the warranty expired equipment.. Any malfunction or damage occurs during warranty ( man-made causes and force majeure exclusively), please email or call us immediately, professional engineers will be arranged on the resolution, free cost of changing new parts (consumable parts excluded).
If you have any questions about the product, please do not hesitate to contact us!
Make Production Simpler and Better