Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Plastic Products, Plastic Injection Molding, Plastic Part manufacturer / supplier in China, offering High Glossy Chrome Plating Mould for Plastic Parts, High Quality Aluminum Die Casting Part, High Quality Auto Die Casting Part and so on.

1
    YRS
General Supplier

High Glossy Chrome Plating Mould for Plastic Parts

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $0.50/ Piece
Local Area: Qingdao, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Application: Electronic, Car
Coating: Matte Chrome Plating
Thickness: 0.4-0.5mm
Professional Plastic Injection Mould Manufacturerwith about10 years experience, specializing in Plastic Injection Mould with Cold&Hot Runner/Gas Assistant Mould/High Glossy Mould/2K Injection Mould/IML/Stack Mould.Specification:
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13https://GS2344/NAK80/ASSAB718HASSAB8407
Mold base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1600 Ton
Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automaticallyOffered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.Payment and Delivery
Payment: TT 50% in advance, Balance before shipment(Negotiable).
Delivery Time: 30-45 daysSpecificationDesign Software:UG/CADAnalysis Software:MoldflowPreferred Formats:STP/IGES/UGDesign Time:7-15 daysManufacture Time:20-30 daysDelivery Time:30-45 days