Waiting (bus shelter):
Generally used in conjunction with bus stops for the convenience of the public
When the passengers wait for sun protection, rain, etc., stop at the station, on both sides of the road, or on the bay-type bus of the green belt.
By standing on the building of transport facilities.Due to the increasing development of urban public transport, bus shelters have developed into
An indispensable and important part of the city, the beautifully designed bus shelter also became acity.
Beautiful scenery.General Shelter Shelter Main Shed, Upright, Top Bow, Advertising Light Box and Sit
Stool composition, also used partitions instead of advertising light boxes
Parts introduction (zinc plating, aluminum, stainless steel)
Ceiling:Square /Tube /Shaped /Channel +Package Board /Sun Board /PC Board /Insulation Board
frame:Square /Tube /Shaped /Channel Steel
Light box:(single-sheet/double-sided):frame (aluminum/sheet metal) +light-emitting panel (PC/acrylic/glass/light cloth) +LED light (light source/backlight) +powersupply (no rain/proof Rain /Waterproof) +Lock (triangle lock /buckle lock) +Breathable function (blinds /ABS circular vents) +hydraulic rod;Accessories (for paintingsystem /LED display /WIFI /bus intelligent system /camera /touch screen)
Stool:Square /Tube /Shaped /Channel +Plate (Plate /Punching)
Solar system:Solar panel +conversion controller +battery (solar system can only use measuring light LED)Product DescriptionProduct NameIndoor Air Conditioning metal Bus Stop Shelter with Glass Door bus shelter station solar bus stop advertising display
frame MaterialStainless steel, aluminum, galvanized sheet optional!Conventional aluminum profile.
The PackagingBubble Cotton &cardboard, Wooden boxes for export
ColorGray, you can customize the color.
SpecificationCustomThe light sourceHigh Brightness LED Light
Advantage&ServiceBussheltercaninstallsolarPanels,leddisplay,Airconditioningandelectricdoor.
Certificate:ISO9001:2015.After-saleservices:Warrantyisoneyearaboutinstallwillhavedrawingtoshow.ifyouneed,wecansendthepersontoInstallationInstructions.Butyouneedtopay.somelaborcostsandfullresponsibilityforaccommodation,etc.Payment:TT,30%deposit,70%balancebeforeship.Ifyouhaveanyquestions,pleasecontactme.