FRP Pipe, High Pressure Pipe, GRP Pipe manufacturer / supplier in China, offering Water Supplying FRP/GRP High Pressure Pipe, FRP Roofing Sheets Making Machine, Fiberglass Composite Cheap Building Material FRP Pultrusion Profiles Materials and so on.
Min. Order / Reference FOB Price | |
---|---|
100 Set | US $10.00/ Set |
Local Area: | Beijing, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Type: | Cordless Drill |
---|---|
Classification: | Impact Drill |
Drill Brand: | Zlrc |
* Drill Hole at Wood / metal / Concrete
Wood: 0 - 28mm
metal:0 - 16mm
Conrete: 0 - 12mm
* Working as screw driver
* Glazing
Packing
Color box
Unit box size
22.5*22.5*5.5cm
Quantity
5pcs
N.W./G.W
8/9 kg
Measurement
30x24.5x24.5cm
Qty per 20 F
7800pcs
MOQ
500
1. LED light --- easy work in dark place.2. Two level gear box --- easy to change the speed and Torque.3. Mini Body --- more comfortable operation4. all part can be interchangeable with Bosch5.It can adapt to high-intensity work environment Decoration, assembly, building ect.6. adding a bearing. Concentricity of the drill better.7. Waterproof design with led lights, 19 torque gear.
Our Services
1- Provide RESEARCH & DEVELOPMENT Service,For Customer Exclusive Model;2- Provide OEM Service;3- More Than 10 Years,Professional Power Tools Experience;4- Welcome Small And Big Size Customer Orders;5- 100% QC Inspection Before Shipment;6- After-sales-service With 12 Months Warranty;7- Provide the best service to our global customers.We warmly welcome contact or inquiry from you!!
Company Information
BEIJING ZLRC Enviromental Protection Equipment Co., ltd mainly foucs on FRP products and FRP related machine manufacture and export.Our main products include electric drill and all power tools, pipe production line, FRP tank production line,valves,water meters and other industrial hardware and so on.
Product show
FAQ
Q1. Are you a manufacturer or trading company?
A: A professional manufacturer of tool chest,roller cabinet,work bench and tool products
Q2. What is the lead time?
A: Normally speaking, it asks for 35 days for mass production except during observed holidays.
Q3. Do you develop any new designs every year?
A: More than 100 new products are developed each year.
Q4. What's your term of payment?