Hydraulic Bridge Jack, Post Tension Jack, Tensioning Jack manufacturer / supplier in China, offering Large Tonnage Post Tension Jack Tensioning PC Strands Pulling System, Cold Extrusion Steel Coupler Carbon Connetor Rebar Threading Couplers, Upset Forging Rebar Threading Coupler Connecting Coupling and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Piece | US $900.00/ Piece |
Local Area: | Xian, Shaanxi, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment |
Type: | Scarifier Machine |
---|---|
Object: | Cement Concrete Pavement |
Moving Type: | Mobile |
Description of Multi- head Floor Scabblers:
Hand pushing concrete floor scabblingis used to remove cement tower and floor coat of concrete road and bridge with high hardnessallowy bush hammer.
2.Hand pushing concrete floor scabbling not only improves the work efficiency and quality and make the face to achieve uniform roughness,to remove surface laitance strong pavement concrete after binding.
3.Hand pushing concrete floor scabbling is made of quality hardness alloy bush hammer, strong impact, and long life.
The most widely recognized item of Concrete Surface Preparation equipment, also described as a Scabbler, Groover or Scarifier. Typical uses include reducing screeds and levels, commonly referred to as planing; removal of coatings, line markings & membranes; texturing and grooving surfaces, often to increase Slip Resistance; removal of laitance and surface deposits, including ice in cold stores.
Parameters:machine typeZTMS-11AZTMS-15AZTMS-23Aweight80KG108KG156KGWorking width1260mm1260mm1260mmB.P.M The number of hammers per minute2200*112200*152200*23Air consumption500l/min700l/min900l/minThe noise level is decibel56db56db56dbVibration Level Mean Equivalent4.96 Square meter per second4.96 Square meter per second4.96 Square meter per secondAir compressor matching requirementsPressure of 5kg /cm,Displacement of 0.8 cubic meters /minPressure of 5kg /cm,Displacement of 0.8 cubic meters /minPressure of 5kg /cm,Displacement of 1.0 cubic meters /minSpeak concrete mark concrete markWork efficiencyWork efficiencyWork efficiencyC50 concrete25-30 square meters /hour @1-3 mm40-50 square meters per hour @1-3 millimeters50-60 square meters per hour @1-3 millimetersC40 concrete32-37 square meters per hour @1-3 millimeters50-60 square meters per hour @1-3 millimeters60-70 square meters per hour @1-3 millimetersC30 concrete40-45square meters /sales @1-3 mm60-70 square meters per hour @1-3 millimeters70-80 square meters per hour @1-3 millimeters