Business Type:
Trading Company
Business Range:
Office Partition, Doors and Windows, Floor tile
Establishment:
2018
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T, D/P, WesternUnion
Main Markets:
Domestic
OEM/ODM Service
Sample Available

Wall Dividers, Office Glass Wall Partitions, Partitions Separationg The Rooms manufacturer / supplier in China, offering Shaneok Free Standing Glass Room Dividers, Tempered Glass Wall Partition, Anti Static Raised Access Floor System, Ceramic Tile, OA500 Steel Network Floor, Raised Access Floor and so on.

1
    YRS
General Supplier

Shaneok Frameless Clear Glass Partition

Get Latest Price
Min. Order / Reference FOB Price
100 Pieces US $45.00/ Pieces
Local Area: Shanghai, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, WesternUnion
Style: Modern
Color: Custom Color
Certification: ISO9001, CCC, ISO14001,SDS
Product Description
Glass TypeTempered glass,Ultra clear glass,Tempered Laminated glass,Fireproof glass,etcAccessoryGalvanized steel U-shape GrooveGlass Thickness10mm/12mm offeredSize1200*3000 (Can be customized)Surface finishPolishedSealantHigh strength double sided foam sticky tapeSound Proof Coefficient43dBPainting methodsAnodizing,Powder Coating,Fluorocarbon Coating,etcColor&PatternCustomizedServiceODM&OEMCertificationISO9001,ISO14001,SDS,CCC
Product Details
Our Service
1) Professional manufacturer and exporter with 18 years production and engineering experience;
2) Free CAD design,R&D department welcomes your OEM&ODM projects.
3) Self-developed mold and durable products.Packaging & Delivery
Packaging Details
Export carton box and wood pallet or customized packaging
Delivery Time
Shipped in 20 days after advance payment(T/T 30% deposit advanced,balanced before shipping)Purchase StepStep 1: Send an inquiry to us.
Step 2: Send detailed project drawings or dimensions to us.
Step 3: We provide the solution and quotation.
Step 4: Negotiation and details discussion.
Step 5: Place order and arrange deposit.
Step 6: Make detailed shop drawing for approval before production.
Step 7: Arrange production after the shop drawing /confirm/ied.
Step 8: Quality control and Inspection.(Production pictures will be provided for checking)
Step 9: Arrange balance
Step 10:Arrange shipping after received the balance.
Step 11:Provide shop drawing for installation
Step 12: After salesCheap partition walls,frameless clear glass partition wallPlease contact us if you have any concerns with your order. We are dedicated to 100% satisfaction and we will make sure you are happy with your purchase. We hope you will see that we offer 5-star service.