Business Type:
Manufacturer/Factory
Business Range:
Stainless Steel Handrail, Pipe Fitting, Handrail Fittings, Stainless Steel Balustrade, ..
Establishment:
2012
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Main Markets:
North America, Europe, Africa
OEM/ODM Service
Sample Available

Kitchen Mixer, Mixer Tap, Pull Down Faucet manufacturer / supplier in China, offering Ablinox Stainless Steel Single Handle Upc Pull out Kitchen Faucet, Square Handle Stainless Steel Casting Kitchen Faucet (AB108), Durable Quality Stainless Steel Upc Kitchen Faucet (AB016) and so on.

1
    YRS
General Supplier
Supplier Homepage Service Other Service Stainless Steel Bathroom Fittings/Towel Rack/Paper Holder/Bathroom Accessoreis

Stainless Steel Bathroom Fittings/Towel Rack/Paper Holder/Bathroom Accessoreis

Get Latest Price
Min. Order / Reference FOB Price
50 Piece US $4.00/ Piece
Local Area: Zhaoqing, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Type: Bathroom Shelves
Material: Stainless Steel
Color: Silver
Product Description:1. Material: SUS304, SUS316
2. Surface: Satin finish/ mirror finish
3. Standard size according to the drawings
Why chooseGuangdong ABLinox Sanitaryware CO.,LTD
1, OEM services are available, welcome to visit our factory or show room before you place an order.
2, high quality control with ISO9001;
3, up to 8 years stainless steelmanufacture whose products export to all over the world;
4, detailed productions and installation drawings are provided;
5, easy to install, only use screws to install, no need welding.
6, new product output with best price and quality.Certifications:
A. Quality management system certificate
B. China building decoration association membership certificate
C. China council for the promotion of international trade membership certificate
D. China association for quality inspection qualified product
E. CE certificationPackage:1. Pearl cotton/buble bag inner, outer carton
2. Wood crates or pallet are availableInstallation:
1. Just screw, no welding, easy to intall
2. Detailed installation drawing and instruction will be providedPayment term:
L/C T/T 30%-50% deposit, balance before delivery and shipment
Delivery time:
30-35days after deposit and drawing /confirm/iation
Factory IntroductionABL was founded in 2008 by Kate Liang, started from a 400 square meters workshop.In 2009, Supported by customers and suppliers, ABL moved to a 4000 square meter workshop and expand our business all over the world.In 2012, We have sold our products to more than 200 countries, and our brand existed in more than 50 countries in the world.In 2013, We have passed CUPC,NSF,CE and ROHS cetificate,starting entered into the European and American markets.In 2014, with fast development,ABL moved to a 50000 square meters factory. We have our own stainless steel investment casting production lines and also completed machining equipments.In 2015, We set up our management team. We have cooperated with some unversities and getting bigger. At the same time, we are also Alibaba training center.From 2016 to 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001 certificate. we have already cooperated with some top 500 enterprises.2018, ABL focus more on the Lean Production and preparing for the next five years.Welcome to visit our Factory.FAQ:
1. How to get aquotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note,and we could provideprofessional advice for your reference.
2. What if we do not have casting drawing?
Samples would be available, and we would send you drawing to /confirm/i.
Of course,we would ensure the safety of the drawing.
3. How to pay?
T/T is preferred.
4. How to ship?
For small quantity, we have cooperation with DHL,TNT, FEDEX, UPS etc
For big quantity, air or sea would beavailable for you to choose.5. What about the packing details?
We have our regular packing.
If you have any special requirements,we would be willing to help.
6. What about the delivery time?
It would be 20-30 days normally for the parts to be ready and we had a system to ensure the time.
When you made your order, you would know.