Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Bedside Cabinet Price, Plastic Bedside Cabinet, Cheap Bedside Cabinet manufacturer / supplier in China, offering Sy-R074 Hospital Furniture Cheap Bedside Cabinet, Sy-AC048 Emergency Ambulance Ultrasound Scanner Home Mini Ultrasound, Sy-B143 China New Clinical Touch Screen Semi Auto Chemistry Analyzer and so on.

1
    YRS
General Supplier
Supplier Homepage Health & Medicine Medical-Ray Protective Products Sy-1148 Hospital X-ray Film Illuminator LED Negatoscope Film Viewer

Sy-1148 Hospital X-ray Film Illuminator LED Negatoscope Film Viewer

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $30.00/ Piece
Local Area: Guangzhou, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Certification: ISO, CE
Gender: Female, Male
Suitable for: Elderly, Children, Adult
SY-1148 Hospital X-ray film illuminator led negatoscope film viewerFeature of film viewer:
X-ray film viewerfor watch the film
three size viewer
single/double/triple connection
stainless and plastic coate
X-ray film viewer screen
surface:stainless and plastic coatedSpecification of film viewer:specificationconsumption power(W)SCREEN SIZE(mm)remarksingle connection<50360x435
supply voltage:AC220v
Frequency: 50HZdoule connections<80720x435triple connections<1301080x435
Picture of film viewer:
Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.