Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Sand Casting, Grooved Fittings, Coupling, Elbow, Flange
Establishment:
2009
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
LC, T/T
Main Markets:
North America, Europe, Southeast Asia, Middle East
OEM/ODM Service
Sample Available

Pipe Fitting, Grooved Fittings, Grooved Coupling manufacturer / supplier in China, offering FM UL Ce Approved Grooved Pipe Fittings 4 Way Cross, FM/UL Threading Machine Use for Ductile Iron Casting Pipe Fitting, Threading Machine Use for Ductile Iron Casting Pipe Fitting and so on.

1
    YRS
General Supplier
Supplier Homepage Construction & Decoration Pipe Fittings Tee UL FM Approved 1"-12" Grooved Fittings Mechanical Tee

UL FM Approved 1"-12" Grooved Fittings Mechanical Tee

Get Latest Price
Min. Order / Reference FOB Price
100 Piece US $0.73/ Piece
Local Area: Weifang, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Type: Reducing
Connection: Grooved or Threaded
Material: Iron
Installation Instruction for Threaded&Grooved Mechanical Tee1.Pipe Preparation
Clean the gasket sealing surface within 16mm of the hole and inspect the sealing surface visually for defects that may prevent proper sealing of the gasket. Don't drill the hole on weld line.
2.Remove burrs
Remove any burrs or slug before installation to protect the gasket and prevent leakage.
3.Gasket&Housing Installation
Insert the gasket into outlet housing and make sure the tab in the gasket line up with the tab recessing in the housing. Align outlet housing over the pipe hole making sure that the locating collar is in the pipe hole.
4.Alignment
Align the strap around the pipe, insert the bolts and tighten the nuts.
5.Tighten nuts
Alternatively and evenly tighten the nuts to the specified bolt torque.
6.Installation complete
There should be even gaps on two sides between the upper and lower housings.Range of productsRigid coupling, Flexible coupling, 90° Elbow, 45° Elbow, 22.5° Elbow, 11.25° Elbow, Tee, Reducing Tee(Grooved/Threaded), Cross, Reducing Cross(Grooved/Threaded), Mechnical Tee(Grooved/Threaded), Mechnical Cross(Grooved/Threaded), U-bolted Mechnical Tee, Reducer(Grooved/Threaded), Grooved Eccentric Reducer, Grooved Split Flange, Grooved Adaptor Flange, Cap.Detailed information
Size Sheet
about Us
The world's most advanced automatic disa molding line and sand processing ensure the quality of each product.
Tilting shot blasting machine
Test
In order to guarantee the quality, the company introduced German brand spectrograph, advanced KRX-TG, metallographic image analyzer, gasket test equipment, green sand test equipment, cast iron assay analysis equipment, pressure inspection equipment etc. Thus a fast, accurate quantitative analyzing approach is provided for scale production
FAQ
Q: Are you trading company or manufacturer ?
A: We are a factory.
Q: How long is your delivery time?
A: Generally 15 days after the down payment. OEM 30 to 90 days.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance.
Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
Ouradvantages:
1:Globallyacceptabequality:Theproductsofferedbyusarethoroughlyexaminedbyourexperiencedprofessionalstoensuretheirdurability,reliabilityandlongservicelife.
2:Competitiveprice:directmanufacturer,reducingallunnecessarycostforyou.
3:Professionalteam:20yearsforeigncustomersserviceexperience.Over10yearsinvestment castingmanufacture.Almost35%higheducatedpeople.
4:Goodservice:Customerisfirst