Business Type:
Manufacturer/Factory
Business Range:
Roll Forming Machine, High-Frequency Welding Pipe Machine, Slitting And Cut To Length ..
Establishment:
2003
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
LC, T/T
Main Markets:
North America, South America, Europe, Southeast Asia, Middle East, Africa, East Asia(Japan, South Korea), Australia, Domestic
OEM/ODM Service
Sample Available

Roll Forming Machine, Door Frame Roll Forming Machine, Rolling Machine manufacturer / supplier in China, offering Door Frame Automatic Roll Forming Machine, Omega Roll Forming Machine Drive by Chain, Heavy Duty Z Purlin Steel House Roll Forming Machine and so on.

1
    YRS
General Supplier

Yx32-205 Purlin Roll Forming Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Set Contact Supplier
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Certification: CE, ISO9001
Customized: Customized
Condition: New
Main specificationNoSpecification of the material1Suitable MaterialPI/PPGI2Width of the raw materialbased on the purlin sizes.3Thickness1.8mm
Profile drawing:
Layout of the machine
Uncoiler- feeding- leveling- punching-roll forming-correct system-cutting-out tableSpecification of Components1Machine structureWire-electrode cutting structure2Total powerMotor power-7.5kw
Hydraulic power-5.5kw3Roller stations14 stations+ one station of correct system4Productivity0-15m/min5Decoiler5T hydraulic decoiler6Drive systemBy chain7Diameter of shaft65mm, 45# solid shaft8Roller materialGcr15,HRC hardness and chrome plated surface9Post hydraulic cutting systemCr12 with heat treatment 58-60°, 3 sets of cutter10Punching3 units10
Voltage380V 50Hz 3phases (Customized)
Warranty
Warranty:1 year warranty from date of shipment
Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period