Business Type:
Manufacturer/Factory,Trading Company
Establishment:
2016
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

1
    YRS
General Supplier
Supplier Homepage ChemicalsPaints CoatingsBuilding Coating China Competitive Price Reflective hot-melt Road Marking Paint for Road Safety Line

China Competitive Price Reflective hot-melt Road Marking Paint for Road Safety Line

Get Latest Price
Min. Order / Reference FOB Price
10 Kilograms US $0.50/ Kilograms
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: JIANBNAG
CAS No.: 6776303-5
Other Names: road marking paint
MF: MF
Product DescriptionCompetitive Price Reflective hot-meltRoad Marking Paint for Road Safety Line

Density: 1.94g/cm3

Drying time: not more than 5mins

Glass beads contents:20%

Softening point: 101degree

The single component product is mainly prepared by acrylic resin, pigment, filler and auxiliaries. The main advantages of this
product are great adhesion, and strong-level resistance to water, alkali and weather. Moreover, its film is clean and tenacious.



Excellent Features● low VOC emission
● Fast drying
● High reflectivity
● Abrasion resistant
● Long durability
● Easy to repairHow to use
Concrete surface treatment:
a. First of all, it is necessary to confirm whether reliable damp-proof facilities are installed below the concrete base. The new
concrete or cement base should be cured for at least 28 days, and its moisture content should not exceed 5%. The moisture content
of the base should be evaluated by empirical method.
b. The base surface should be clean, solid and pollution-free, such as slurry and paint splashing, curing agent, grease and so on.
For excessive float pulp, it is better to first use slight roughing, polishing, oil-stained ground, using electric angle grinder
to polish.
c. The cracks and empty drum on the floor surface should be repaired first.
d. Whatever method is used to treat the surface, a clean, solid and dry base surface must be obtained. It is especially important
that the grassroots should not be in a state of rising tide.
e. The base layer is cleaned and sanded with a sander.Factory OverviewCustomer Visit