Business Type:
Manufacturer/Factory
Business Range:
Roll Forming Machine, High-Frequency Welding Pipe Machine, Slitting And Cut To Length ..
Establishment:
2003
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
LC, T/T
Main Markets:
North America, South America, Europe, Southeast Asia, Middle East, Africa, East Asia(Japan, South Korea), Australia, Domestic
OEM/ODM Service
Sample Available

Roll Forming Machine, Door Frame Roll Forming Machine, Rolling Machine manufacturer / supplier in China, offering Door Frame Automatic Roll Forming Machine, Omega Roll Forming Machine Drive by Chain, Heavy Duty Z Purlin Steel House Roll Forming Machine and so on.

1
    YRS
General Supplier

China Double Layer Roll Forming Machine Drive by Chain

Get Latest Price
Min. Order / Reference FOB Price
1 Piece Contact Supplier
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Type: Rolling Machine
Forging Forming Method: Mold Forging
Power Source: Electric
Double Layer Roll Forming Machine (940mm)

Profile drawing:

(1) Up layer:

(2) Down layer

NoSpecification of the material1
Suitable MaterialColored Steel plate, Galvanized steel2
Width of the raw material1220mm3Thickness0.3mm-0.8mm


2.Machine Detailed Parameters:

1Machine structureGuide pillar structure2Total powerMotor power-7.5kw
Hydraulic power-5.5kw3Roller stationsUp about 18 stations
Down about 18 stations4Productivity0-15m/min5Drive systemBy chain6Diameter of shaft¢70mm solid shaft7
Voltage380V 50Hz 3phases (Customized)8
Container need40GP container


3.Specification of Components

No Technical Specification & Remark 1Manual Un-coiler
Width of feeding: 1250mmCapability: 5 TonInter diameter: 500-590mmMaximal out diameter: 1500mmMode of expand &fight: inner expand &fight by manualWay of feeding: manualColor: blueQuantity: 12Main Roll Forming Machine
Roller material: SAE1045 chrome plated surface with chromeShaft diameter: ¢70mm material: SAE1045 with quenching and tempering3Machine structure:
Main frame by 350H beam welding Machine structure: guide pillar4Hydraulic cutting system
Cutting after forming: Cut the sheet after roll forming to required length Uses two hydraulic cylinders for operation.Material of blade:Cr12, 58-62 HRC hardness Cutting power by hydraulic,5.5KWWorking pressure: 12Mpa adjustableLength measuring: Automatic encoder length measuringTolerance of length: +/- 1.5mm for each piece end product5Hydraulic System

Hydraulic power: 5.5kwWorking pressure: 12Mpa adjustableSolenoid valve: 1 groupHydraulic oil: 46# hydraulic oilQuantity :1
6Computer Control Cabinet
Programmable setting of profile length and quantity5 groups data can be set in one timeOperating system language: English and ChineseVoltage, Frequency, Phase: 380 V, 50 Hz, 3PhaseComputer used to control length & quantity. Machine will automatically cut to length and stop when required quantity is achievedLength inaccuracy can be amended easily.Control panel: Button-type switch and touch screenUnit of length: millimeterPLC brand: Panasonic7Out table
Jointed by steel tubeSize: about 2.0m long*0.8mwide*0.6-1mhighOne out table with three support rollerQuantity: 2 units8Spare Parts
Bearing: 2 pieces.Limit switch: 2 piecesRelay: 2 pieces.Oil tube: 1 pieceScrews and nuts: some.Chain: 1 pieceTools: spanner, hex spanner and adjustable wrench and other correlative adjust machine tools

5. Packing & DeliveryDeliver time: take goods after receive deposit 80 daysPacking: suitable of ocean transportation4. WarrantyWarranty: 1 year warranty from date of shipmentGuarantee:1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 80$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
5. Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipmen