Jiangyin City Source Electrial Machinery Co., Ltd was founded in 2009, located in Jiangsu Province, near Shanghai airport. Its family owned enterprises have 6 factories, the scope of business covers e...
Min. Order / Reference FOB Price | |
---|---|
1 Sets | US $40000.00/ Sets |
Local Area: | Jian, Jiangxi, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, Paypal, Western Union |
Brand: | CITY SOURCE |
---|
Power supply
380V, 50Hz
Total power
8KVA
System gas supply
0.5Mpa~0.8Mpa, No oil, no water, clean compressed air source
Ultrasonic frequency
20Khz
Machine size
6700*2200*1950mm
Number of operators
1 person
Machine weight
2000kgs
Production efficiency
100PCS/min
The production line realizes the full-automatic production of the plane mask, including the whole production process of feeding, folding and pressing, nose rib feeding, mask forming, cutting, ear band feeding, welding, finished product blanking, etc., from the raw material of the roll to the finished product of the mask.
According to the production requirements of 2~4 layers mask, 2~4 feeding places of roll
material are available for selection, folding &welding will be finished at one time.
The production line is divided into two parts to increase production capacity
The ear band is welded by ultrasonic, with good quality and durability.
1. What brand of electrical appliances do you use? Can we specify a brand?
In the electrical part, we mostly use Schneider and Siemens, and can accept the brand designated by customers
2. What service can you supply?
Engineers available to service machinery overseas.
3. What’s the packages?
The normal package is wooden box. If export to foreign countries,the wooden box will be fumigated or use polywood case.
4. Can you do turn-key project?
Yes, We have a mature technical team that can do turnkey engineering.
5. What’s the payment terms?
30% by TT as deposit, 70% by TT or LC at sight vefore delivery.
6. What’s your advantages?
As a member of the family business, we have a copper production plant. Therefore, we are more familiar with the production process. At the same time, we have professional engineers and can get more direct use feedback. We have a good cooperative relationship with most of the domestic machinery manufacturers, so we can get a better price.
7. What’s the delivery time?
Usually 60 working days.