Business Type:
Manufacturer/Factory
Business Range:
Roll Forming Machine, High-Frequency Welding Pipe Machine, Slitting And Cut To Length ..
Establishment:
2003
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
LC, T/T
Main Markets:
North America, South America, Europe, Southeast Asia, Middle East, Africa, East Asia(Japan, South Korea), Australia, Domestic
OEM/ODM Service
Sample Available

Roll Forming Machine, Door Frame Roll Forming Machine, Rolling Machine manufacturer / supplier in China, offering Door Frame Automatic Roll Forming Machine, Omega Roll Forming Machine Drive by Chain, Heavy Duty Z Purlin Steel House Roll Forming Machine and so on.

1
    YRS
General Supplier

China Yx30-50 Precision High Frequency Welding Pipe-Making Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Piece Contact Supplier
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Condition: New
Customized: Customized
Theory: Roll Forming and Welding
Technology procedures
Uncoiling--Butt shearing& Welding--Horizontal accumulator --Flattening--Forming--HF welding---Scraper--Cooling---Sizing---Straightening----Flying cutting off----Run out table.
Main technical specification
1 Raw material (steel coil) condition
Steel coil material: Hot rolled or cold rolled low carbon steel
2 Finished product requirements
Round pipe
Out diameter: 20~63.5mm
Wall thickness: 0.8~3.0mm
3 Machine arrangement
Machine arrangement form: Split style
Arrangement: Feed, side discharge (look from console, decided by customer)
Machine production speed: 0~80m/min
Warranty: 1 year warranty from date of shipment
Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Reparis will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 80$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.