.Technical parameterItemSBS/APPmodifiedasphaltmembraneproductionlineFeature1.Flexiblelayoutbasedoncustomer'sfactory2.Engineersoverseasinstallationaftersales3.Easyoperation4.Versatileproductioncapacityforvariousspecifications5.EffectivesmoketreatingsystemtoprotectenvironmentStandardstructureof
oneset1.Indoorrollformingline2.HeatingBoilerSystem3.Rawmaterialsmixerandoxidationsystem4.Smoketreatingsystem(Outdoorparts)Characteristica) SBS modified bitumen water proofing membrane is specially used as waterproof material in cold areab) APP is specially suitable for areas of high temperature and of strong sun-shineSBS/APP ModifiedBitumen Water proofing Membranec)Good performance in Good impermeability ,anti-puncture, anti-broker, anti-resistance, anti-erosion, anti-mildew,anti-weatheringd)Possess good tensile strength, elongation rate and size stability which could be well suited the substratedistortion and crackApplication method1.Make sure the roof deck smooth,clean and dry(Moisture<9%),then apply the surface of roof deck homogeneouslywith a kind bitumen paint till dry to start application.2.There are two methods in application:
One way is by heating and melting method---Heat the polyethylene film of the membrane and roof decksurface byheating and melting method to be nearly melted (not flowing),then install the membrane fullybonded to the roofdeck with overlaps of 5-10cm.The other way is by cold adhesive method---Pour the coldadhesive homogeneouslyon the roof deck,then roll the membrane to install it to be fully sticked to roofdeck.By heating and melting method and by cold adhesive can be used in alternation in application asrequested.3.After application ,a full serious inspection is required to sure no air bubble,no fold,no falling
away etc.toguarantee the waterproof life.
FAQSBS APP modified bitumen membrane production line, bitumen waterproof membrane machine to producebitumen membrane rolls1)Engineers will supply overseas installation guiding service.
2)Installation will be finished within 3 months normally.
(buyer should supply enough labour help and installation tools help )
3)Trial operation will be finished within 15days normally.
(buyer should supply necessary raw materials and auxiliary tools and rooms )
4)We welcome your visit to our factory ,then,it would be our greatest pleasure to introduce every part toyouface-to-face. you can choose the parts you need or delete the parts you don't need.modified bitumenmembraneproduction line, bitumen waterproof membrane machine