SY-O010 China Medical dialysis powder price
Specification of dialysis powder:
Dialysis powder A:
Mixing ratio: A:B: H2O=1:1.225:32.775
Performance:Content per Liter (anhydrous substance) NaCl: 210.7g KCl: 5.22g CaCl2: 5.825g MgCl2: 1.666g citric acid: 6.72g
The product is the special materials used for the preparation of haomodialysis dialysate whose function is removing metabolic waste and maintaining the balance of water, electrolyte and acid-base by the dialyser.
Description: white crystalline powder or granules
Application: The concentrate made from haemodialysis powder matching with haemodialysis machine is suitable for haemodialysis.
Specification: 2345.5g/2 person/bag Dosage: 1 bag/ 2 patients
Dialysis powder B:
Mixing ratio: A: B: H2O=1:1.225:32.775
Performance: This product contains 84g sodium bicarbonate, and is the special materials used for the preparation of haomodialysis dialysate whose function is removing metabolic waste and maintaining the balance of water, electrolyte and acid-base by the dialyser.
Description: white crystalline powder or granules
Application: The concentrate made from haemodialysis powder matching with haemodialysis machine is suitable for haemodialysis.
Specification: 1176g/2 person/bag Dosage: 1 bag/ 2 patients
Picture of dialysis powder:
Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.